Difference between revisions of "2.09 Fix The View-O-Scope"
m (Text replace - "==Hints==" to "==Hints== Ask teams what they have done, probing details if necessary (often this will get a team unstuck by themselves). ") |
|||
Line 113: | Line 113: | ||
==Hints== | ==Hints== | ||
+ | |||
+ | Ask teams what they have done, probing details if necessary (often this will get a team unstuck by themselves). | ||
+ | |||
Revision as of 05:56, 21 March 2012
Contents
- 1 Status
- 2 Location
- 3 Type
- 4 Plot Setup
- 5 Props
- 6 Detailed Description
- 7 How To Give To Teams
- 8 Plot Point to Convey
- 9 Short Description
- 10 Open Time Period
- 11 Staff Instructions
- 12 Puzzle Answer
- 13 Puzzle Solution
- 14 Budget
- 15 Credits
- 16 Manager
- 17 Hints
- 18 Response to Correct Answer
- 19 To Do
- 20 Other Notes
Status
::REVISE::
Location
Name And Address: Outside of Peninsula Clock Shop, 2440 South El Camino Real, San Mateo
Parking: free street
Bathroom: No
Food: No
GC PoC: (650) 395-8463, lab@trenchwood.com
Type
Optional Puzzle
Plot Setup
- All evidence of Trenchwood Institute and its timeline has mysteriously disappeared.
- Peach Frontier Laboratories has taken its place
- Iconoclast scientist Prof. Chronos has attempted to demonstrate her time machine before an audience of VIPs.
- But it malfunctioned due to faulty key components--four "quantum chronomentometers."
- The malfunction is causing the Professor to bounce around randomly in time from era to era, facing untold dangers!
- The players have submitted designs for replacement chronomentometers--a key step towards fixing the time machine
- The players have discovered the password to Prof. Chronos's supercomputer--another key step
- The final key repair step is fixing View-o-Scope
- The players have decodes a secret message hidden by Prof. Chronos while she was in the past: she wants to be sent to May 31, 1986 at 2:15 PM
Props
Detailed Description
Two cables inside the viewoscope's "alternate signal processor" got accidentally swapped. (Janitorial staff saw they had come loose, and put them back wrong.) Study a photograph/diagram of the tangled cables, and figure out which two got miswired. Swapping them solves the puzzle and activates the viewoscope.
How To Give To Teams
Lab assistant sends email
- The time machine is almost working. But we need to get the View-O-Scope repaired before we can lock onto Prof. Chronos. Can you help?
- Our colleagues at Central Peninsula Applied Physics can help. Please go there and ask for the View-O-Scope repair information.
- Research Project Title: Fix the View-O-Scope
- Objective: Enable to View-O-Scope to see into the past, not just this evening's video feed from the lab
- Location: Central Peninsula Applied Physics, 2440 South El Camino Real, San Mateo
- Upon Completion: Email repair instructions to lab@peachfrontier.com
- Parking: free street
- Personnel Required: As many as possible, but driver may stay in vehicle
- Bathrooms: No
- Food: No
Plot Point to Convey
Short Description
The teams need to help Doctor When repair the time machine's View-O-Scope.
Open Time Period
Approximately 3 AM to 4 AM
Staff Instructions
Your Role: Lab assistant at Central Peninsula Applied Physics
What To Wear: lab coat + Central Peninsula Applied Physics name badge
What Your Character Knows: Nothing except that Doctor When needs help fixing a View-O-Scope
Puzzles At This Site: Fix The View-O-Scope
Where To Get Materials: GC HQ
Setup Instructions:
- Call GC when you arrive
Handout Instructions: Lab assistant says words to the effect of,
blah
Hints: Teams have been instructed to call GC; if you familiarize yourself with the attached hints feel free to assist
Answers: Teams have been instructed to phone in their answer to the Laboratory. If they try to give you the answer, remind them to follow instructions.
Site Close Down:
- Call GC
- Return any unused materials to GC HQ
- Return your name badge(s) and lanyard to GC HQ at the end of your shift
Other Instructions:
- Stay in character.
- Except ... if a team says "time out," break character and help them.
Puzzle Answer
Swap the "70" and "GCD output" plugs. Alternatively, swap the "50/50 input" and the "left AVG input" plugs (they're the same cables).
Puzzle Solution
The "PHASE DRIVER" block supplies the signals, which exit at the "YINTEGRATOR" and "YANGLE" blocks.
Perform simple arithmetic on the numbers: GCD = Greatest Common Denominator, AVG = average (arithmetic mean), 50/50 = split into two halves.
The current wiring yields 180 and 180 (in phase); they should be 90 and 270 (opposite phase). There are only 55 swaps possible, and many of them can quickly be ruled out. The rest is trial and error.
Budget
Credits
Manager
Sean
Hints
Ask teams what they have done, probing details if necessary (often this will get a team unstuck by themselves).
Response to Correct Answer
Immediately send the appropriate email at the beginning of 2.10 Christmas Party